Roof Tear-Off Cost in 2026

    By the National Roofing Directory Editorial TeamFigures reviewed

    Stripping and hauling away the existing roof — the line item that is usually bundled into a replacement quote and is worth pulling out and looking at on its own.

    Estimated range — not a quote

    Roof Tear-Off Cost — national estimate

    Low end

    $1,500

    Typical

    $3,000

    High end

    $9,000

    What this covers: stripping the existing roof covering to the deck and hauling it away, including the container.

    Per roofing square (100 sq ft of roof surface)

    $100–$300(typical $150)

    The job figures above are this per-square range applied to a 15–30 square roof (20 squares for the typical case). Multiply your own square count by the per-square figure and you will get a closer estimate than any national average can give you.

    Modelled estimate. These figures come from national industry-typical ranges, not from quoted jobs, and no one has looked at your roof. Use them to sanity-check a bid — never as a substitute for one.

    What the low, typical and high jobs look like

    A range is only useful if you know which end you are at. These are the three jobs the numbers above describe.

    Low$1,500

    one layer of asphalt on a walkable single-story roof, easy truck access

    Typical$3,000

    one to two layers of asphalt on an average home at a 5/12 to 6/12 pitch

    High$9,000

    multiple layers, a steep or multi-story roof, or a heavy covering such as tile or cedar shake with the disposal weight that implies

    How this work is priced

    Tear-off is usually invisible in a replacement bid, folded into a single per-square number. It is worth separating, because it is the part of the job that varies most with things you can actually verify in advance — how many layers are up there, how steep the roof is, and how close a truck can get.

    The cost is roughly half labor and half disposal, and the disposal half is driven by weight rather than area. Asphalt shingles run in the region of 250 to 400 pounds per square, so a 20-square roof with two layers is somewhere around four to six tons of material going into a container. That is why a second layer costs more than a proportional amount extra, and why tile and slate tear-offs are in a different price class entirely.

    What is and is not in the price

    Most of the distance between two quotes is scope, not margin. Read both columns before you decide one contractor is expensive.

    Normally included in the price

    • Stripping the roof covering down to the deck
    • Removing old underlayment, drip edge and flashing
    • Pulling or driving down nails
    • Loading debris into a container or trailer
    • Disposal or landfill fees
    • Magnet sweep of the grounds and gutters

    Normally billed separately

    • Decking replacement discovered after the strip
    • Removal of a satellite dish, solar array or antenna
    • Asbestos-containing material, which is a specialist abatement job
    • Landscaping protection beyond ordinary tarping
    • Interior protection where the attic is finished or storage is exposed

    What pushes the price to the top of the range

    Multiple layers

    Each layer is another pass of labor and roughly another full container's share of weight. Two layers commonly runs $50 to $125 per square above one.

    Steep pitch

    Above about 7/12 the crew cannot simply shovel material down the slope, and the staging required slows everything. Steep-pitch surcharges of 25% to 50% on the labor are normal.

    Heavy materials

    Concrete tile, clay tile and slate weigh several times what asphalt does. Both the removal labor and the disposal tonnage go up accordingly.

    Poor access

    If the container cannot be placed next to the house, every square has to be carried further. Narrow lots, steep drives and mature landscaping all show up here.

    Rising landfill tipping fees

    Disposal is a pass-through cost that varies by jurisdiction and has generally been rising. A contractor who separates it as a line is being transparent, not padding.

    What keeps it at the bottom

    A single layer over sound plywood

    The fastest tear-off there is, and the one with the fewest surprises underneath.

    Shingle recycling where it is available

    Asphalt shingles can be recycled into road material in some markets, and where a recycler is close the tipping fee can be lower than the landfill. Worth asking about; not available everywhere.

    Doing it as part of a full replacement

    Tear-off as a standalone job carries mobilization cost twice. It is nearly always cheaper as part of the re-roof.

    Component costs

    The pieces a quote for this work is assembled from. Use them to interrogate a bid line by line — a contractor who can explain each of these is worth more than one who cannot.

    National component cost ranges for a roof tear-off.
    Line itemRangeUnitNotes
    One layer asphalt, walkable pitch$100–$175per squareThe baseline case.
    Two layers asphalt$150–$275per squareRoughly double the disposal weight, not double the labor.
    Three or more layers$200–$350per squareIncreasingly rare; most codes cap at two.
    Cedar shake or shingle$200–$400per squareLight material, slow removal, often over spaced sheathing.
    Concrete or clay tile$200–$450per squareHeavy. Disposal weight drives the price.
    Slate$250–$600per squareHeavy and often salvageable — ask whether salvage offsets the cost.
    Steep-pitch surcharge, 8/12 and above$25–$75per squareApplied on top of the base tear-off rate.
    Container or dump trailer$350–$700per jobSometimes bundled, sometimes separate. Ask which.

    National baseline tear-off ranges. If a replacement bid does not break this out, ask for it — it is the easiest part of a quote to sanity-check.

    Size your own roof before you read a quote

    Every number in this guide is priced against roof area, and roof area is not house area. Put your footprint dimensions and your pitch into the squares calculator and you will know how many squares you are buying — which turns a vague estimate into arithmetic you can check against a bid.

    Roof Tear-Off Cost by city

    The same model, adjusted by each metro’s cost index and written with the climate and building context that applies locally. Only the metros we have modelled appear here — there is no page for a city we have not.

    Common questions

    How do I know how many layers are on my roof?

    Look at the roof edge from a ladder at the eave, or at the rake edge where the shingles overhang. Each layer is visible as a separate course in section. A contractor will check this during the estimate, and the number should appear in the written scope.

    Can I tear off my own roof to save money?

    It is legal in most places and it is a bad trade. Tear-off is the most dangerous phase of the job, the debris volume surprises people, you own the container and the tipping fee, and if the deck is exposed when weather arrives the damage is yours. Contractors also generally will not warrant work over a deck they did not strip themselves.

    What happens if it rains mid-tear-off?

    A competent crew strips only what they can dry in and covers the exposed deck before leaving each day. Ask directly how they handle weather, because the answer tells you a lot about how the rest of the job will go.

    How we build these cost ranges

    The short version: these are industry-typical ranges, not a quote.

    These are modelled ranges, not quotes

    Every figure on this page is an estimate produced by a model, not a price anyone has been charged. We do not collect invoices, we do not receive bid data from contractors, and we do not have a feed of completed jobs. If you need a number you can rely on, the only source of one is a written quote from a contractor who has been on your roof.

    Where the national ranges come from

    The national baseline for each work type is an industry-typical installed-price band: the range that published cost guides, manufacturer installation literature and ordinary contractor pricing conventions broadly agree on for 2026. Each band is expressed low / typical / high, and where the work is genuinely sold by the square we show the per-square price and the roof size assumptions separately, so the whole-job figure can be re-derived rather than taken on trust.

    Where the city adjustment comes from

    Each metro carries a single cost index, with 1.00 meaning the national baseline. The index is our own editorial estimate of where local labor, overhead and permitting sit relative to the national middle, based on the well-established general pattern that construction costs run higher in large, high-wage, densely-built metros and lower in smaller ones. It is not a measured price feed, it is not a licensed location-factor dataset, and it is not derived from local quotes. The city figure is simply the national band multiplied by that index.

    What we deliberately do not do

    We do not publish invented local statistics. There is no "average roof size in your city" on this site, because we have not measured one. Local context here is limited to climate, geography and building-practice factors that are true of the region and that you can verify independently. We would rather be generic and correct than specific and made up.

    Why the numbers are rounded

    Modelled figures are rounded before display — to the nearest $500 above $10,000, the nearest $100 above $1,000, and more finely below that. A modelled estimate printed to the exact dollar is claiming a resolution it does not have. The rounding is the honest representation of how coarse these estimates really are.

    What the model cannot see

    It cannot see your pitch, your decking, how many layers are up there, how a truck reaches your house, what your local supplier quoted this month, or how booked the good crews are after the last storm. Those factors routinely move a real quote further than the entire spread between our low and high figures. Treat these ranges as a way to tell a plausible quote from an implausible one — nothing more than that.

    A note on this particular topic

    Tear-off is rarely purchased on its own. These figures exist so you can check the tear-off share of a replacement bid, and the per-job total assumes it happens as part of a re-roof rather than as a separate mobilization.

    Cost model version 2026.08. Baselines and the regional index are reviewed periodically; the date shown on each page is the date that page's figures were last reviewed. Contractor listings on this site are compiled from public records — confirm any contractor’s licence and insurance with your state licensing board before work begins.

    Other cost guides

    The only real number is a written quote

    Get three, scoped alike — same material line, same underlayment, same flashing treatment, same per-sheet decking rate. Search roofing companies by city or state and contact them directly, free and with no middleman.