Live Roofing Desk35 active storm alerts

    The industry

    Installation & Repair · MFR

    R & U-Panel Manual — Metal Roofing Installation Guide

    Mueller, Inc.NRD reference

    R & U-Panel Manual — Metal Roofing Installation Guide — Mueller, Inc., 2017.

    Source: Mueller, Inc. · · 2017

    • Mueller, Inc.
    • Installation & Repair
    • u-panel
    • manual
    • metal
    • roofing
    • installation
    • guide

    This browser does not display PDFs inline. The document is unchanged — download it or open it in a new tab with the buttons above.

    From the document

    PREPARATION REQUIREMENTS & RECOMMENDATIONS This detail & installation manual has been provided to serve as a basic guideline for installing the Mueller R & U-Panel roof system. This manual should be used in conjunction with the erection drawings to help ensure proper installation of this roof system. In case of discrepancies, the erection drawings will govern over this installation guide. It is the customer’s responsibility to ensure that a competent and experienced erection crew is chosen for the installation of this roof system. It is also the customer’s responsibility to ensure the erection crew understands and follows this installation manual and the erection drawings. Mueller, Inc. is not responsible for any problems or defects caused by improper erection techniques. Any questions in regards to clarifying the intent of this manual or the erection drawings should be directed to Mueller’s sales department at the phone number shown on the back cover. Warning! When these panels are installed on roofs with less than recommended pitches (R-Panel recommended minimum pitch is 1/2:12, U-Panel recommended minimum pitch is 1:12), heavy rainfall may lead to water accumulation and possible leaks. It is important that the roof be properly prepared before installation begins. Decking Mueller, Inc. recommends our metal roofing systems be installed over CDX plywood wooden roof decking with a minimum thickness of 15/32” or equal. Note: If using treated lumber, special corrosive resistant screws are required. Ask your sales representative for more information. Stripping The removal of existing roofing and the associated fasteners is optional with R & U-Panels. This does not damage, and typically improves, the structural capacity of wood decks. During removal, many shingle fasteners may remain embedded in the deck. These fasteners can be pulled out or hammered flush with the deck. Repairs Deteriorated areas should be removed and replaced with material to closely match the existing thickness. The deck should be sound and smooth, with fasteners flush with the surface, prior to the installation of the metal roof. New wood decking, whether boards, planks, CDX plywood, or equal should be the same thickness and have similar strength characteristics and span ratings to that of the area being replaced. Deck fasteners that have backed out should have a new fastener installed adjacent to it and the existing fastener should be removed. Loose or lifted boards, planks, plywood, and corners should have additional fasteners installed to secure the existing deck in place. Holes in wood decks that are 10” wide or less can be covered with 20-gauge steel. This steel plate should be galvanized and must overlap the wood roof deck 4 inches minimum and be secured with fasteners 4 inches on center. Fascia boards should be straight, level and in good condition. Any rotted or deteriorated boards should be replaced. All roof framing and decking abnormalities will be transferred to the new metal roof if not corrected before sheeting begins. Underlayment New underlayment must be immediately installed over prepared roof decking. Mueller recommends Titanium or a minimum 30# felt. This underlayment should be installed with a minimum of a 2” side lap and a 6” end lap. Underlayment temporarily protects the roof decking against water penetration. It should be installed using galvanized tin caps (not plastic caps). The underlayment should be fastened to the deck with galvanized roofing nails with tin caps 12” on center in the field and 6” on center at the sidelap. Flashing Re-roofing projects incorporate metal flashing and metal counter-flashing. Some counter-flashing are embedded, such as a masonry wall, or are installed behind existing siding. This metal, if not deteriorated, may be reused. The existing metal can be cut, leaving approximately a minimum of 2” of flashing exposed, and new counter-flashing can be fastened to the backside of the existing metal. Counter-flashing must be slightly higher than the top of the rib on the sheets to be installed. SAFETY CONSIDERATIONS As with all major construction projects, safety should be a primary concern. The erector or contractor should be sure that all OSHA safety rules are followed and that job safety is strictly adhered to. The following safety equipment is highly recommended when installing metal roofing: 1. Safety rope and harness 2. Hand protection 3. Eye protection 4. Hearing protection 5. Soft rubber soled shoes Metal roofing presents several specific safety issues: 1.  Metal roofing is extremely slick and does not provide firm footing. Extreme care should be taken when: A. Working on roofs with very steep pitches. B. Working on roofs when moisture is present. C. Working on roofs when high wind is a factor. D. Working with long panels. 2. Metal edges are very sharp and should be handled with care. 3. Care should be used when lifting panels due to their weight. 4. Always check for overhead electrical lines and exercise care not to have metal sheets come in contact with them. 5.  All electrical tools should be inspected regularly for damaged cases or frayed electric cords. Extension cords should be inspected for damaged or frayed insulation. Tools which do not meet good safety standards should not be used.

    An excerpt from the opening of the document, reproduced here so it can be read and searched. Mueller, Inc. holds the rights to the full work. The complete document is above.

    Provenance · Obtained from publicly circulated copies; no ownership claimed; removal honored on request

    Every document here names its publisher. Documents were gathered from public circulation and are posted in good faith with attribution — no ownership is claimed, nothing is sold, and rights holders can have anything removed on request. Read the content notice

    More from Installation & Repair

    On the same shelf

    Manufacturer bulletinPDF · 2 pages · 174 KB

    GAF TAB-C 2015-31: Repairing Hail Damage to Granule-Surfaced Membranes

    GAF's commercial technical advisory bulletin on hail that scours granules off a granule-surfaced membrane: what to inspect for, when coating the membrane is an acceptable repair, and the Diamond Pledge guarantee question that follows a coating repair.

    GAFGAF Technical Services · 2015

    Manufacturer bulletinPDF · 2 pages · 239 KB

    GAF TAB-R-178: Mixing New and Aged Asphalt Shingles

    GAF's bulletin on whether new shingles can be used to repair an aged roof — it allows it when dimensions and exposure match, warns that a perfect color blend is "not likely," forbids trimming shingles to match, and notes aged shingles crack during repair. Central to matching disputes.

    GAFGAF Residential Consumer Services · 2025

    Manufacturer bulletinPDF · 1 page · 574 KB

    GAF TAB-R 2017-164: Underlayment Requirements for Hips and Ridges on a Single-Plane Repair

    One-page GAF bulletin on how underlayment must be lapped over a hip when only one roof plane is being replaced, including removing end nails on the adjacent plane and re-nailing — the detail that turns a single-slope repair into work on the neighboring slope.

    GAFGAF Technical Services · 2017

    Back to the full library